Railways technical investigations
Carbonne english summary
Technical inquiry report on the multiple fracture of rail passed at high speed by trains on 23 November 2013 at Carbonne (31)
22 janvier 2019
Bully-Grenay english summary
Technical inquiry report on a derailment of a coal train on 29 July 2010
28 août 2014
Neufchâteau english summary (interim report)
Interim report on derailment of railway wagons carrying dangerous substances on 22 May 2010
28 août 2014
Choisy-le-Roi english summary
Technical inquiry report on a derailment of an RER C train on 20 December 2009 due to a fallen parapet block
28 août 2014
Boisseuil english summary
Technical inquiry report on a collision between a passenger train and an agricultural trailer on 3 July 2009
28 août 2014
Orthez english summary
Technical inquiry report on a derailment of two rail wagons carrying dangerous substances on 24 November 2009
27 août 2014
Livernant english summary
Technical inquiry report on a collision between a train and the load of a passing train in the Livernant Tunnel on 20 May 2009
27 août 2014
Stade de France english summary
Technical inquiry report on the collision of an RER B train with a group of people on 7 March 2009 near the Stade de France
26 août 2014